বিদ্যুৎ সঞ্চালন

The main operating function of PGCB is wheeling of energy from BPDB power stations and Generation Companies to Distribution entities utilizing transmission network. PGCB gets its energy wheeling charge from its clients(distribution entities) at the rate fixed by Bangladesh Electricity Regulatory Commission (BERC).
The PGCB took over about 1144 circuit km of 230 kV lines, 5255 circuit km of 132 kV lines, 6 nos of 230/132 kV substation and 63 nos of 132/33 kV substations from BPDB and DESA in different phases. Transmission lines of the company up to June, 2021 are stood at 950 ckt km of 400 kV lines, 3658 circuit km of 230 kV lines, 8086.3 circuit km of 132 kV lines and 1 nos of 400 kV Station, 3 nos of 400/230kV subtation, 2 nos of 400/132kV subtation, 26 nos of 230/132 kV substation and 120 nos of 132/33 kV substations.
The company has taken infrastructure development projects for further development of its operation.

 

Transmission Infrastructure Information
Tansmission Line as on: June, 2021
400kV 950 Circuit km
230kV 3,658 Circuit km
132kV 8,086.3 Circuit km
141.6 Circuit km (Others)
Substation as on: June, 2021
400kV 1 Nos. 2x500MW HVDC Back to Back station
400/230kV 3 Nos. 3,120 MVA
1 Nos. 650 MVA (Others)
400/132 kV 2 Nos. 1,300 MVA
230/132kV 26 Nos. 14,625 MVA
5 Nos. 1,460 MVA (Others)
132/33kV 120 Nos. 23,492 MVA
36 Nos. 5,711.6 MVA (Others)
Dispatch Capacity at 33kV level 27,102 MW (Including all organizations)
Last Five years achievement
400kV Substation 1 Nos. 1x500MW HVDC Back to Back station
400/230kV 2 Nos. 2,080 MVA
400/132 kV 2 Nos. 1,300 MVA
230/132kV Substation 6 Nos: 2,850 MVA
132/33kV Substation 29 Nos. 13,133 MVA
400kV Transmission Line 696.61 Circuit km
230kV Transmission Line 528.83 Circuit km
132kV Transmission Line 1,908 Circuit km